 |  | Fibre and Micro-Concrete Roofing Tiles - Production Process and Tile-Laying Techniques (ILO, 1992, 172 p.) |
 |  | (introduction...) |
 |  | FOREWORD |
 |  | ACKNOWLEDGEMENTS |
 |  | CHAPTER I INTRODUCTION |
 |  | I. OBJECTIVE |
 |  | II. BRIEF DESCRIPTION OF TECHNOLOGY |
 |  | III. COMPARATIVE REVIEW OF MAJOR ROOFING MATERIALS |
 |  | III.1 Wood |
 |  | III.2 Bamboo |
 |  | III.3 Grass - Straw - Thatch - Reed - Papyrus |
 |  | III.4 Corrugated sheet |
 |  | III.5 Clay tiles |
 |  | III.6 Brick and stone: arches |
 |  | III.7 Fibre or micro-concrete |
 |  | IV. PRODUCTION SCALE |
 |  | V. CONTENTS OF TECHNICAL MEMORANDUM |
 |  | VI. TARGET AUDIENCE |
 |  | CHAPTER II RAW MATERIALS AND MORTAR |
 |  | (introduction...) |
 |  | I. SAND |
 |  | (introduction...) |
 |  | I.1 Granulometry |
 |  | I.2 Grain shape |
 |  | I.3 Clay content: sand equivalent |
 |  | I.4 Impurities |
 |  | II. AGGREGATE - GRAVEL |
 |  | II.1 Rationale |
 |  | II.2 Characteristics and selection |
 |  | III. CEMENT |
 |  | IV. FIBRE |
 |  | (introduction...) |
 |  | IV.1 Rationale |
 |  | IV.2 Modification of the physical properties of tiles due to fibre adjunction |
 |  | IV.3 Types of fibres |
 |  | IV.4 Sisal (figure 9) |
 |  | IV.5 Coir |
 |  | V. MORTAR |
 |  | (introduction...) |
 |  | V.1 Cement: sand/aggregate ratio |
 |  | V.2 Fibres |
 |  | V.3 Water |
 |  | V.4 Summary of ratios and quantities of raw materials |
 |  | VI. ADDITIVES |
 |  | (introduction...) |
 |  | VI.1 Setting accelerators |
 |  | VI.2 Setting retarders |
 |  | VI.3 Waterproofing agents |
 |  | VI.4 Pigments (colouring agents) |
 |  | VI.5 Fluidifiers |
 |  | VII. IMPROVING PERFORMANCE |
 |  | (introduction...) |
 |  | VII.1 Carbonation of the cement |
 |  | VII.2 Furnace slag and pozzolana |
 |  | VII.3 Vegetable ash |
 |  | CHAPTER III EQUIPMENT |
 |  | (introduction...) |
 |  | I. ELECTRIC VIBRATING TABLE (figures 18 and 19) |
 |  | II. HAND-POWERED VIBRATING TABLE (figure 20) |
 |  | III. SCREEDING FRAMES |
 |  | (introduction...) |
 |  | III.1 Screeding frame for flat tiles or pantiles (figure 21) |
 |  | III.2 Roman tile frame |
 |  | III.3 Ridge tile screeding frame |
 |  | III.4 Second nib tool |
 |  | IV. INTERFACE |
 |  | V. MOULDS |
 |  | (introduction...) |
 |  | V.1 Pantile mould |
 |  | V.2 Ridge tile moulds (figure 24) |
 |  | V.3 Ridge tile demoulding jig (figure 26) |
 |  | V.4 Bar mould for first row tiles (figure 27) |
 |  | VI. QUALITY CONTROL JIG (figure 28) |
 |  | VII. BATCHING BOXES AND SCOOPS FOR RAW MATERIALS |
 |  | (introduction...) |
 |  | VII.1 Standard ratios: good quality raw materials |
 |  | VII.2 Non-standard ratios: poor quality raw materials |
 |  | VIII. MORTAR SCOOPS |
 |  | IX. CURING TANKS |
 |  | X. HAND TOOLS |
 |  | X.1 Sieves and screens |
 |  | X.2 Trowel (or float) |
 |  | XI. OTHER MOULDS |
 |  | XII. PLANT EQUIPMENT/PRODUCTION RATIO |
 |  | CHAPTER IV PRODUCTION PROCESS |
 |  | (introduction...) |
 |  | I. INTRODUCTION |
 |  | I.1 Influence of climate |
 |  | I.2 Calculating quantities by weight and volume |
 |  | II. STEP-BY-STEP MANUFACTURING PROCESS - PANTILES |
 |  | II.1 Stocking of raw materials |
 |  | II.2 Preparation of raw materials |
 |  | II.3 Mixes and ratios |
 |  | II.4 Moulding |
 |  | II.5 Setting of the mortar |
 |  | II.6 Demoulding |
 |  | II.7 Curing |
 |  | II.8 Storage |
 |  | III. RIDGE TILE AND HIP TILE |
 |  | (introduction...) |
 |  | III.1 Ridge tiles jointed on the roof |
 |  | III.2 Ridge tiles with overlap |
 |  | III.3 Joint between ridge tile and hip tile |
 |  | IV. FIRST ROW OF TILES |
 |  | V. VALLEY TILES |
 |  | CHAPTER V QUALITY CONTROL |
 |  | I. STANDARDS |
 |  | I.1 Rationale |
 |  | I.2. Example of standard specifications |
 |  | II. RAW MATERIALS |
 |  | III. FINISHED PRODUCTS |
 |  | III.1 Shape and dimension |
 |  | III.2 Tile strength |
 |  | III.3 Porosity test |
 |  | IV. PROBLEMS AND SOLUTIONS1 |
 |  | CHAPTER VI ORGANIZATION OF PRODUCTION |
 |  | I. PREREQUISITES |
 |  | II. INFRASTRUCTURE |
 |  | III. TRAINING |
 |  | IV. MANPOWER |
 |  | V. ORGANIZATION OF PRODUCTION |
 |  | V.1 General |
 |  | V.2 Production chart |
 |  | V.3 Typical production layouts |
 |  | CHAPTER VII ROOF STRUCTURE |
 |  | (introduction...) |
 |  | I. BASIC PRINCIPLES |
 |  | II. ROOF DESIGN |
 |  | III. WIND LOAD |
 |  | IV. ROOF PITCH |
 |  | V. TIMBER SECTIONS |
 |  | VI. A COMPARISON OF ROOF STRUCTURES FOR CORRUGATED IRON AND FIBRE OR MICRO-CONCRETE CLADDING |
 |  | VI.1 The problem |
 |  | VI.2 Economics of concrete cladding |
 |  | VI.3 Conclusion |
 |  | VII. ROOF DESIGN AND TIMBER CONSUMPTION |
 |  | (introduction...) |
 |  | VII.1 Lean-to design (figure 85) |
 |  | VII.2 Costing of galvanized iron sheet roof (figure 86) |
 |  | VII.3 Costing of short-span fibre or micro-concrete roof (type I) (figure 87) |
 |  | VII.4 Roofing material for fibre or micro-concrete roof (large span) (type II) (figure 88) |
 |  | VIII. COMPARATIVE COSTING OF CORRUGATED IRON AND FIBRE OR MICRO-CONCRETE ROOF COVERINGS |
 |  | CHAPTER VIII LAYING THE TILES |
 |  | (introduction...) |
 |  | I. WATERTIGHTKESS |
 |  | I.1 Edges |
 |  | I.2 Wall-plates |
 |  | I.3 Waterproof polythene sheet |
 |  | II. LAYING THE BATTENS (OR LATHS) |
 |  | III. CALCULATION OF RAW MATERIALS CONSUMPTION |
 |  | (introduction...) |
 |  | III.1 Estimate |
 |  | III.2 Example of calculation |
 |  | IV. LAYING THE TILES |
 |  | V. FIXING THE TILES TO THE BATTENS |
 |  | V.1 Pantiles |
 |  | V.2 Double nib tiles |
 |  | V.3 Fixing ridge tiles |
 |  | CHAPTER IX FEASIBILITY STUDY |
 |  | (introduction...) |
 |  | I. PRELIMINARY STUDY |
 |  | II. VARIATIONS IN PRODUCTION COSTS |
 |  | III. METHODOLOGY FOR THE ESTIMATION OF PRODUCTION COSTS |
 |  | IV. APPLICATION OF THE CONSTANT METHODOLOGY |
 |  | (introduction...) |
 |  | IV.1 DETERMINATION OF THE OUTPUT AND INPUTS |
 |  | IV.2 ESTIMATION OF UNIT PRODUCTION COST |
 |  | IV.3 COST COMPARISONS FOR DIFFERENT MATERIALS |
 |  | CHAPTER X SOCIO-ECONOMIC CONSIDERATIONS |
 |  | (introduction...) |
 |  | I. DECENTRALISATION OF INDUSTRY |
 |  | II. USE OF LOCALLY AVAILABLE MATERIALS |
 |  | III. PROMOTION OF EMPLOYMENT |
 |  | IV. INVESTMENTS - FOREIGN EXCHANGE SAVINGS |
 |  | V. TILE PRODUCTION COSTS AND HOUSING CONSTRUCTION COSTS |
 |  | VI. CONCLUSIONS |
 |  | ANNEXES |
 |  | ANNEX I GLOSSARY OF TECHNICAL TERMS |
 |  | ANNEX II AGENCIES TO BE CONTACTED FOR INFORMATION ON FIBRE CONCRETE TECHNOLOGY |
 |  | ANNEX III BIBLIOGRAPHY |
 |  | QUESTIONNAIRE |
 |  | Other ILO publications |
 |  | Back Cover |